Close Menu

    Subscribe for news

    Recent news

    Atacul cibernetic de la Cadastru blochează piața imobiliară rezidențială

    July 21, 2026

    ACEA: Vânzările de mașini electrice au înregistrat un salt de 43% în luna mai

    June 23, 2026

    Cum și-a transformat Lumen Technologies întreaga forță de muncă în dezvoltatori de agenți IA

    June 22, 2026
    Facebook LinkedIn
    Facebook LinkedIn
    industrynews.roindustrynews.ro
    Send press release
    • Energy
    • Financial
    • Companies
    • Construction
    • Transportation
    • AI for business
    industrynews.roindustrynews.ro
    Home»Energy»Renalfa Power Clusters Acquires Two Large-Scale Renewable Assets in Romania
    Energy

    Renalfa Power Clusters Acquires Two Large-Scale Renewable Assets in Romania

    Renalfa Power Clusters has successfully completed the acquisition of two renewable energy projects in Romania. The first asset, Horia 2, is a photovoltaic power plant with an installed capacity of 365 MWp.
    By Andreea IonescuApril 4, 2026No Comments2 Mins Read
    Facebook Twitter Pinterest LinkedIn Tumblr Email
    Share
    Facebook Twitter LinkedIn Pinterest Email

    Renalfa Power Clusters has successfully completed the acquisition of two renewable projects in Romania. The first asset, Horia 2, is a photovoltaic plant with an installed capacity of 365 MWp. The second is a photovoltaic plant with an independent BESS in Arad, with 400 MW/800 MWh, both located in the west of the country, in Arad county. The new owner intends to combine and redesign the projects into a single energy cluster and expand the installed capacity of both photovoltaic and BESS in the near future. Both acquired projects are fully permitted, at an advanced stage of development, with commercial launch expected in 2027.

    Renalfa Power Clusters will expand the Horia – Arad energy cluster in two stages. In the first expansion, the solar capacity will be increased to 568 MWp, and the BESS capacity will grow to 669 MW / 2,000 MWh. The second phase will add another advanced independent BESS of 400 MW / 1,608 MWh, potentially in combination with more photovoltaic plants.

    „After the construction is completed, the Horia-Arad cluster will pioneer three deep-tech innovations: a hybrid storage plan with dual lithium-ion and sodium-ion battery chemistry, a grid-forming inverter technology, and a proprietary AI-based dispatch and control platform. Together, these will transform the expanded cluster into a so-called «Sovereign Grid Anchor,» capable of providing grid services previously exclusive to thermal power plants,” said Ivo Prokopiev, CEO of Renalfa.

    This is the first acquisition by Renalfa Power Clusters, a newly formed joint venture between the clean energy and e-mobility investment group Renalfa Solapro Group, based in Vienna, and the investment management company RGREEN INVEST, based in Paris, through its INFRAGREEN equity funds.

    The new joint venture, targeting Poland and Romania as its main markets, builds on the scale and success of the partners' first joint venture, Renalfa IPP. In less than five years, Renalfa IPP has become one of the leading investors and operators in Europe of utility-scale hybrid assets equipped with long-duration storage (BESS). This rapid development has enabled Renalfa IPP to implement an innovative business model and become the first company in Europe to bring to market green products for baseload electricity.

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

    Related Posts

    Greenvolt vinde două proiecte de stocare din Polonia de 400MW/ 1.6 GWh către A&R Investments

    October 23, 2026

    SANY cumpără un nou proiect de stocaj de 153 MW de la Renovatio

    October 21, 2026

    Caroli Foods utilizează, din acest an, energie solară în activitatea fabricii sale din Pitești

    October 21, 2026
    PPA
    Most read articles

    OMV Petrom: Proiectul eolian de la Gura Văii (CEE Onești) obține o finanțare de 47 de mil. euro

    July 27, 2026

    PPC Renewables adaugă parcului eolian Fântânele-Vest un sistem BESS de 45 MW/ 91 MWh

    July 23, 2026

    PPC: Șapte stații de încărcare ultra-rapide pentru vehicule electrice, puse în funcțiune la Aeroportul Otopeni

    July 21, 2026

    Gradațiile corespunzătoare tranșelor de vechime în muncă majorează între 2,5% și 7,5% salariul de bază

    July 21, 2026
    Don't Miss

    BIMsprint: Digitalizarea construcțiilor devine o condiție de piață

    Construction October 23, 2026

    Digitalizarea sectorului construcțiilor va deveni, în următorii ani, o condiție tot mai importantă pentru accesul…

    O veche breșă de securitate arată cât de mult s-a scurtat timpul de reacție al companiilor în era AI

    October 23, 2026

    Guvernanța fiscală înainte de exit: Cât contează în prețul tranzacției?

    October 23, 2026

    Iarna insolvențelor: Valul de falimente va continua să crească – analiză

    October 23, 2026

    Subscribe for news

    Subscribe for news

    PPA
    industrynews.ro
    Facebook LinkedIn
    • Energy
    • Companies
    • Construction
    • Financial
    • Transportation
    • AI for business
    • About us
    • TERMS AND CONDITIONS
    • Privacy Policy
    • COOKIES POLICY
    • EDITORIAL DISCLAIMER
    • Contact
    © 2026 industry news. All rights reserved

    Type above and press Enter to search. Press Esc to cancel.

    English
    Romanian