Close Menu

    Subscribe for news

    Recent news

    Atacul cibernetic de la Cadastru blochează piața imobiliară rezidențială

    July 21, 2026

    ACEA: Vânzările de mașini electrice au înregistrat un salt de 43% în luna mai

    June 23, 2026

    Cum și-a transformat Lumen Technologies întreaga forță de muncă în dezvoltatori de agenți IA

    June 22, 2026
    Facebook LinkedIn
    Facebook LinkedIn
    industrynews.roindustrynews.ro
    Send press release
    • Energy
    • Financial
    • Companies
    • Construction
    • Transportation
    • AI for business
    industrynews.roindustrynews.ro
    Home»Energy»The e-Mobility scheme will also include the component of investment in renewable sources and storage
    Energy

    The e-Mobility scheme will also include the component of investment in renewable sources and storage

    The state aid scheme for the development of electric vehicle charging infrastructure on the national network of highways, expressways, and national roads, „e-Mobility RO,” aims to develop a strategic network of fast and ultra-fast charging stations for electric vehicles, located on highways, expressways, and national roads managed by the National Company for Road Infrastructure Administration (CNAIR).
    By Alexandru PopescuApril 15, 2026No Comments3 Mins Read
    Facebook Twitter Pinterest LinkedIn Tumblr Email
    Share
    Facebook Twitter LinkedIn Pinterest Email

    The e-Mobility state aid scheme will include a new category of eligible expenses, namely investments in the production of energy from renewable sources and in storage systems, directly integrated with charging infrastructure, announced on Wednesday, on his social media page, the Minister of Transport and Infrastructure, Ciprian Șerban, quoted by Agerpres.

    „We are preparing an essential amendment to the e-Mobility state aid scheme, through which we will introduce a new category of eligible expenses: investments in the production of energy from renewable sources and in storage systems, directly integrated with charging infrastructure. This initiative stems from a reality we can no longer ignore: in numerous areas, distribution grids are operating at their capacity limit and do not allow for sustained increases in power required for the development of high-capacity charging stations. Under these conditions, continuing development that is exclusively dependent on the grid actually means slowing down the transition to electric mobility. Through this amendment, we will reduce pressure on the grid, provide flexibility to beneficiaries, and enable the accelerated development of charging capacities where technical blockages currently exist.” Șerban wrote on Facebook.

    According to the minister in charge, Romania needs solutions that work in practice, and the goal is to decarbonize the transport sector.

    „At the same time, the intervention directly addresses the current economic context, marked by volatile energy prices, exacerbated by geopolitical developments and tensions in the Middle East. Integrating renewable energy production and storage into charging infrastructure projects means more predictable costs, operational resilience, and protection of long-term investments. It is not just a technical adjustment, but a strategic decision. Romania needs solutions that work in practice, and this change does exactly that. It removes blockages, optimizes resources, and concretely advances the decarbonization goal of the transport sector.” , the official pointed out.

    The state aid scheme for the development of electric vehicle charging infrastructure on the national network of highways, expressways, and national roads, „e-Mobility RO,” aims to develop a strategic network of fast and ultra-fast charging stations for electric vehicles, located on highways, expressways, and national roads managed by the National Company for Road Infrastructure Administration (CNAIR).

    The total budget allocated to this scheme is 299 million euros, with an average annual budget not exceeding 149.5 million euros within each competitive tendering procedure.

    According to official data, in relation to the allocated budget, the maximum estimated number of beneficiaries is 25, and the maximum amount requested per beneficiary within all competitive tendering procedures cannot exceed 30 million euros.

    The disbursement of state aid can be made until December 31, 2030, while the project implementation period cannot exceed June 30, 2030.

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

    Related Posts

    Greenvolt vinde două proiecte de stocare din Polonia de 400MW/ 1.6 GWh către A&R Investments

    October 23, 2026

    SANY cumpără un nou proiect de stocaj de 153 MW de la Renovatio

    October 21, 2026

    Caroli Foods utilizează, din acest an, energie solară în activitatea fabricii sale din Pitești

    October 21, 2026
    PPA
    Most read articles

    OMV Petrom: Proiectul eolian de la Gura Văii (CEE Onești) obține o finanțare de 47 de mil. euro

    July 27, 2026

    PPC Renewables adaugă parcului eolian Fântânele-Vest un sistem BESS de 45 MW/ 91 MWh

    July 23, 2026

    PPC: Șapte stații de încărcare ultra-rapide pentru vehicule electrice, puse în funcțiune la Aeroportul Otopeni

    July 21, 2026

    Gradațiile corespunzătoare tranșelor de vechime în muncă majorează între 2,5% și 7,5% salariul de bază

    July 21, 2026
    Don't Miss

    BIMsprint: Digitalizarea construcțiilor devine o condiție de piață

    Construction October 23, 2026

    Digitalizarea sectorului construcțiilor va deveni, în următorii ani, o condiție tot mai importantă pentru accesul…

    O veche breșă de securitate arată cât de mult s-a scurtat timpul de reacție al companiilor în era AI

    October 23, 2026

    Guvernanța fiscală înainte de exit: Cât contează în prețul tranzacției?

    October 23, 2026

    Iarna insolvențelor: Valul de falimente va continua să crească – analiză

    October 23, 2026

    Subscribe for news

    Subscribe for news

    PPA
    industrynews.ro
    Facebook LinkedIn
    • Energy
    • Companies
    • Construction
    • Financial
    • Transportation
    • AI for business
    • About us
    • TERMS AND CONDITIONS
    • Privacy Policy
    • COOKIES POLICY
    • EDITORIAL DISCLAIMER
    • Contact
    © 2026 industry news. All rights reserved

    Type above and press Enter to search. Press Esc to cancel.

    English
    Romanian