Close Menu

    Subscribe for news

    Recent news

    Atacul cibernetic de la Cadastru blochează piața imobiliară rezidențială

    July 21, 2026

    ACEA: Vânzările de mașini electrice au înregistrat un salt de 43% în luna mai

    June 23, 2026

    Cum și-a transformat Lumen Technologies întreaga forță de muncă în dezvoltatori de agenți IA

    June 22, 2026
    Facebook LinkedIn
    Facebook LinkedIn
    industrynews.roindustrynews.ro
    Send press release
    • Energy
    • Financial
    • Companies
    • Construction
    • Transportation
    • AI for business
    industrynews.roindustrynews.ro
    Home»Energy»EC opens an investigation into state aid for the R1 retubing at Cernavodă
    Energy

    EC opens an investigation into state aid for the R1 retubing at Cernavodă

    By Alexandru PopescuApril 17, 2026No Comments4 Mins Read
    Facebook Twitter Pinterest LinkedIn Tumblr Email
    Share
    Facebook Twitter LinkedIn Pinterest Email

    The European Commission has opened an in-depth investigation to assess whether the public support that Romania intends to grant for the technological upgrading and life extension of Unit 1 of the Cernavodă Nuclear Power Plant is in line with EU state aid rules, the institution announced. The decision is a standard procedure for highly complex energy projects and, given the decision-making practice in similar cases, we expect a favorable decision early next year, stated Bogdan Chirițoiu, president of the Competition Council, quoted by the central press, following the announcement.

    In January 2026, Romania notified the Commission of its intention to support the technological upgrading of Unit 1 of the Cernavodă Nuclear Power Plant, maintaining the same electricity production capacity of 706 megawatts, so that it can operate for another 30 years.

    Unit 1's reactor was commissioned in 1996. Currently, it provides approximately 10 % of Romania's electricity needs. As the reactor is scheduled to reach the end of its estimated lifespan in 2027, extending its life with a new 30-year operating cycle is essential for ensuring the long-term availability of low-carbon electricity. The project's objective is to enhance Romania's electricity supply security and contribute to the Union's decarbonization goals. The beneficiary of the support is Compania Națională Nuclearelectrica S.A. (SNN), the owner and operator of the Cernavodă Nuclear Power Plant, which is majority-owned by the Romanian state and is also the country's sole nuclear power operator. The estimated nominal value of the project is EUR 3.2 billion.

    Romania intends to support the nuclear unit's retooling through four measures: a grant worth EUR 600 million; state guarantees for loans taken out to finance the investment; a 30-year bilateral Contract for Difference (CfD) intended to ensure stable revenues for the plant and a protection mechanism in case of regulatory changes during construction and operation.

    At this stage, based on its preliminary assessment, the Commission considers that the measure is necessary and that the aid facilitates the development of an economic activity. However the Commission has doubts as to the full compatibility of the measure with EU State aid rules. For this reason, the Commission has decided to open an in-depth investigation in order to determine:

    • adequacy and proportionality of the aid package. As there are several aid measures that, together, can limit risks for the beneficiary, it is important to ensure that in the end no more aid than necessary is granted. In particular, the Commission has doubts as to whether the proposed package strikes an adequate balance between reducing risks to create favorable conditions for investment and maintaining incentives for efficient conduct, while avoiding excessive transfer of risks to the state;
    • the impact of the aid measure on market competition and whether it is minimized. In particular, the Commission fears that several essential elements of the contract for difference do not provide effective incentives for operation and maintenance. At this stage, the Commission cannot conclude that there are sufficient safeguards to prevent the aid from being passed on to consumers or certain market participants.;
    • compliance with other provisions of EU legislation, in particular with the principles governing the design of support schemes in the form of two-way contracts for difference, principles laid down in Article 19d(2) of the Electricity Regulation.

    The Commission will now continue its investigation to determine whether its initial concerns are confirmed. The opening of an in-depth investigation will give Romania and any other interested third parties the opportunity to submit their observations, without prejudice to the outcome of the investigation.

    Under the Treaty on the Functioning of the EU (TFEU), Member States are free to determine their energy mix, the conditions under which they exploit their energy resources, and the general structure of their energy supply. The decision to promote nuclear energy is a national competence.

    State aid for the support of nuclear energy can be assessed directly under Article 107(3)(c) of the TFEU, which allows Member States to facilitate the development of certain economic activities under specific conditions. Aid must be necessary and proportionate and must not unduly affect trading conditions to an extent contrary to the common interest. Following the entry into force of the new rules on the organization of the electricity market in July 2024, the Commission is also assessing compliance with the principles for the design of support schemes applicable to two-way contracts for difference, as provided for in Regulation 2024/1747, the institution further states.

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

    Related Posts

    Greenvolt vinde două proiecte de stocare din Polonia de 400MW/ 1.6 GWh către A&R Investments

    October 23, 2026

    SANY cumpără un nou proiect de stocaj de 153 MW de la Renovatio

    October 21, 2026

    Caroli Foods utilizează, din acest an, energie solară în activitatea fabricii sale din Pitești

    October 21, 2026
    PPA
    Most read articles

    OMV Petrom: Proiectul eolian de la Gura Văii (CEE Onești) obține o finanțare de 47 de mil. euro

    July 27, 2026

    PPC Renewables adaugă parcului eolian Fântânele-Vest un sistem BESS de 45 MW/ 91 MWh

    July 23, 2026

    PPC: Șapte stații de încărcare ultra-rapide pentru vehicule electrice, puse în funcțiune la Aeroportul Otopeni

    July 21, 2026

    Gradațiile corespunzătoare tranșelor de vechime în muncă majorează între 2,5% și 7,5% salariul de bază

    July 21, 2026
    Don't Miss

    BIMsprint: Digitalizarea construcțiilor devine o condiție de piață

    Construction October 23, 2026

    Digitalizarea sectorului construcțiilor va deveni, în următorii ani, o condiție tot mai importantă pentru accesul…

    O veche breșă de securitate arată cât de mult s-a scurtat timpul de reacție al companiilor în era AI

    October 23, 2026

    Guvernanța fiscală înainte de exit: Cât contează în prețul tranzacției?

    October 23, 2026

    Iarna insolvențelor: Valul de falimente va continua să crească – analiză

    October 23, 2026

    Subscribe for news

    Subscribe for news

    PPA
    industrynews.ro
    Facebook LinkedIn
    • Energy
    • Companies
    • Construction
    • Financial
    • Transportation
    • AI for business
    • About us
    • TERMS AND CONDITIONS
    • Privacy Policy
    • COOKIES POLICY
    • EDITORIAL DISCLAIMER
    • Contact
    © 2026 industry news. All rights reserved

    Type above and press Enter to search. Press Esc to cancel.

    English
    Romanian