Close Menu

    Subscribe for news

    Recent news

    Atacul cibernetic de la Cadastru blochează piața imobiliară rezidențială

    July 21, 2026

    ACEA: Vânzările de mașini electrice au înregistrat un salt de 43% în luna mai

    June 23, 2026

    Cum și-a transformat Lumen Technologies întreaga forță de muncă în dezvoltatori de agenți IA

    June 22, 2026
    Facebook LinkedIn
    Facebook LinkedIn
    industrynews.roindustrynews.ro
    Send press release
    • Energy
    • Financial
    • Companies
    • Construction
    • Transportation
    • AI for business
    industrynews.roindustrynews.ro
    Home»Construction»Bihor accelerates investments: over 3 billion lei in 46 projects, without loans
    Construction

    Bihor accelerates investments: over 3 billion lei in 46 projects, without loans

    Road, rail and air infrastructure remained the main priority of the Bihor county administration. In 2025, strategic works such as the second section of the Oradea Metropolitan Ring, between Oșorhei and Sânmartin, and the connecting ramp to the Sânmartin ring road were completed.
    By Alexandru PopescuJanuary 1, 2020Updated:February 9, 2026No Comments3 Mins Read
    Facebook Twitter Pinterest LinkedIn Tumblr Email
    bihor investitii
    bihor investments
    Share
    Facebook Twitter LinkedIn Pinterest Email

    Road, rail and air infrastructure remained the main priority of the Bihor county administration. In 2025, strategic works such as the second section of the Oradea Metropolitan Ring, between Oșorhei and Sânmartin, and the connecting ramp to the Sânmartin ring road were completed. Also last year, the Biharia ring road was put into service - the seventh ring road built by CJ Bihor in recent years, notes TransilvaniaBusiness.

    Work on the Paleu-Biharia road is nearing completion, with the technical evaluations for acceptance under way. Also, the Oșorhei overpass, the first in a series of eight planned overpasses, has been completed and opened to traffic. Six others are under construction and a seventh, over Matei Corvin Street, is to be put out to tender as part of the Paleu-Oradea link.

    A complex project was the rehabilitation of the Tinca-Salonta road, affected by overlapping water, sewage and utility relocation works.

    „We accepted a slower pace to support local communities. It was a conscious decision”explained the President of the CJ.

    Source: https://www.ebihoreanul.ro/

    For the mountainous area, the Padiș-Ic Ponor road has a designated builder and works will start this year. At the same time, CJ Bihor has finalized the procedure for the feasibility study for the North Ring Road of Oradea and announced the start of works on the Șumugiu-Mierlău road this summer.

    Tram-Train, the project to redesign the county's mobility

    One of the most ambitious projects is Tram-Train, the metropolitan transportation system that will connect Oradea with the peri-urban area. The project includes the electrification and rehabilitation of the Oradea-Cordău and Oradea-Toboliu railway sections, connections with the tram network, as well as the extension of the tram lines to Borș and Oradea Airport.

    „A metropolitan bus station will be built in front of the station. From there, people will be able to reach Băile Felix, the industrial zone of Borș or the airport quickly”said Mircea Mălan.

    The tender for the rolling stock has been launched and the works will follow in the near future.

    Public buildings, education and social services

    The year 2025 brought the completion of the future County Council headquarters, as well as the rehabilitation of the County Library, complemented by the development of three municipal libraries and the equipping of 26 more in the county. Three DGASPC buildings and Nucet Hospital are being rehabilitated.

    Through PNRR, Bihor County Council has purchased 25 electric minibuses for the transportation of students.

    „They're not Ford minibuses, but Mercedes, with a range of over 400 km, superior equipment and a market price set by auction”said the president of the CJ, in the context of the national debate on this issue.

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

    Related Posts

    BIMsprint: Digitalizarea construcțiilor devine o condiție de piață

    October 23, 2026

    Tranzacțiile imobiliare au scăzut cu aproape 18% în primele nouă luni

    October 21, 2026

    Decalajul investițional: De ce orașele cu potențial se luptă să atragă capital

    October 20, 2026
    PPA
    Most read articles

    OMV Petrom: Proiectul eolian de la Gura Văii (CEE Onești) obține o finanțare de 47 de mil. euro

    July 27, 2026

    PPC Renewables adaugă parcului eolian Fântânele-Vest un sistem BESS de 45 MW/ 91 MWh

    July 23, 2026

    PPC: Șapte stații de încărcare ultra-rapide pentru vehicule electrice, puse în funcțiune la Aeroportul Otopeni

    July 21, 2026

    Gradațiile corespunzătoare tranșelor de vechime în muncă majorează între 2,5% și 7,5% salariul de bază

    July 21, 2026
    Don't Miss

    BIMsprint: Digitalizarea construcțiilor devine o condiție de piață

    Construction October 23, 2026

    Digitalizarea sectorului construcțiilor va deveni, în următorii ani, o condiție tot mai importantă pentru accesul…

    O veche breșă de securitate arată cât de mult s-a scurtat timpul de reacție al companiilor în era AI

    October 23, 2026

    Guvernanța fiscală înainte de exit: Cât contează în prețul tranzacției?

    October 23, 2026

    Iarna insolvențelor: Valul de falimente va continua să crească – analiză

    October 23, 2026

    Subscribe for news

    Subscribe for news

    PPA
    industrynews.ro
    Facebook LinkedIn
    • Energy
    • Companies
    • Construction
    • Financial
    • Transportation
    • AI for business
    • About us
    • TERMS AND CONDITIONS
    • Privacy Policy
    • COOKIES POLICY
    • EDITORIAL DISCLAIMER
    • Contact
    © 2026 industry news. All rights reserved

    Type above and press Enter to search. Press Esc to cancel.

    English
    Romanian