{"id":7732,"date":"2026-07-15T14:59:41","date_gmt":"2026-07-15T12:59:41","guid":{"rendered":"https:\/\/industrynews.ro\/?p=7732"},"modified":"2026-07-15T14:59:41","modified_gmt":"2026-07-15T12:59:41","slug":"ppc-renewables-adauga-parcului-eolian-corugea-un-sistem-bess-de-40-mw-80-mwh-investitie-de-87-mil-lei","status":"publish","type":"post","link":"https:\/\/industrynews.ro\/en\/ppc-renewables-adauga-parcului-eolian-corugea-un-sistem-bess-de-40-mw-80-mwh-investitie-de-87-mil-lei\/","title":{"rendered":"PPC Renewables adaug\u0103 parcului eolian Corugea un sistem BESS de 40 MW\/ 80 MWh, investi\u021bie de 87 mil. lei"},"content":{"rendered":"<p class=\"wp-block-paragraph\">PPC Renewables Rom\u00e2nia, cel mai mare investitor privat \u00een energie regenerabil\u0103 din Rom\u00e2nia, continu\u0103 dezvoltarea portofoliului s\u0103u de capacit\u0103\u021bi hibride \u0219i va construi \u00een cadrul parcului eolian Corugea (CEE Corugea) un sistem de stocare a energiei \u00een baterii (BESS) cu o capacitate de 40,08 MW | 80,16 MWh. Proiectul se ridic\u0103 la o valoare total\u0103 de 87,4 milioane de lei milioane de lei, din care 9,9 milioane de lei co-finan\u021bare european\u0103, prin Fondul pentru Modernizare.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Proiectul continu\u0103 strategia PPC Renewables Rom\u00e2nia de a accelera extinderea portofoliului s\u0103u de energie regenerabil\u0103 cu proiecte de stocare care pot contribui \u00een mod activ la stabilitatea sistemului, prin profilul de produc\u021bie predictibil asigurat de stocarea energiei electrice \u00een baterii. \u00cen cursul acestui an, PPC Renewables Rom\u00e2nia are \u00een plan s\u0103 adauge noi capacit\u0103\u021bi de stocare \u0219i avanseaz\u0103 rapid \u00een acest segment, al\u0103turi de extinderea produc\u021biei din surse regenerabile, pe m\u0103sur\u0103 ce se apropie de pragul de 2 GW \u00een capacit\u0103\u021bi instalate \u00een Rom\u00e2nia.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Situat \u00een regiunea Sud-Est, \u00een localitatea Casimcea, sistemul BESS va fi implementat \u00een cadrul parcului eolian Corugea care \u00eensumeaz\u0103 35 de turbine moderne, cu o putere total\u0103 instalat\u0103 de 70 MW. Parcul produce anual circa 190.000 MWh, suficient pentru a acoperi consumul a peste 70.000 de gospod\u0103rii \u0219i contribuie totodat\u0103 la evitarea a peste 130.000 de tone de emisii de CO\u2082 anual.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Pe l\u00e2ng\u0103 implementarea sistemului de stocare, proiectul implic\u0103 construirea elementelor de infrastructur\u0103 necesare, amenajarea drumurilor de exploatare, acces \u0219i \u00eemprejmuire, implementarea sistemelor de iluminat de siguran\u021b\u0103 \u0219i monitorizare, precum \u0219i a zonei amenajate pentru operare, mentenan\u021b\u0103, paz\u0103 \u0219i organizare de \u0219antier.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Proiectul beneficiaz\u0103 de finan\u021bare prin Fondul pentru Modernizare \u2013 Sprijinirea investi\u021biilor \u00een dezvoltarea capacit\u0103\u021bilor de stocare a energiei electrice (baterii) conectate la o instala\u021bie existent\u0103 de producere a energiei din surse regenerabile. Investi\u021bia se ridic\u0103 la o valoare total\u0103 de 87.416.046,16 lei. Valoarea maxim\u0103 asigurat\u0103 din Fondul pentru Modernizare este de 11,41 % din valoarea total\u0103 a proiectului, respectiv 9.972.705,60 lei, iar valoarea asigurat\u0103 de PPC Renewables Rom\u00e2nia este de 77.443.340,56 lei.<\/p>","protected":false},"excerpt":{"rendered":"<p>PPC Renewables Rom\u00e2nia, cel mai mare investitor privat \u00een energie regenerabil\u0103 din Rom\u00e2nia, continu\u0103 dezvoltarea portofoliului s\u0103u de capacit\u0103\u021bi hibride \u0219i va construi \u00een cadrul parcului eolian Corugea (CEE Corugea) un sistem de stocare a energiei \u00een baterii (BESS) cu o capacitate de 40,08 MW | 80,16 MWh. Proiectul se ridic\u0103 la o valoare total\u0103<\/p>","protected":false},"author":3,"featured_media":7734,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[6],"tags":[],"class_list":["post-7732","post","type-post","status-publish","format-standard","has-post-thumbnail","category-energie"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 5.0.4 - aioseo.com -->\n\t<meta name=\"description\" content=\"PPC Renewables Rom\u00e2nia, cel mai mare investitor privat \u00een energie regenerabil\u0103 din Rom\u00e2nia, continu\u0103 dezvoltarea portofoliului s\u0103u de capacit\u0103\u021bi hibride \u0219i va construi \u00een cadrul parcului eolian Corugea\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Andreea Ionescu\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/industrynews.ro\/en\/ppc-renewables-adauga-parcului-eolian-corugea-un-sistem-bess-de-40-mw-80-mwh-investitie-de-87-mil-lei\/\" \/>\n\t\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 5.0.4\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"industrynews.ro - Industry News este o platform\u0103 de \u0219tiri dedicat\u0103 promov\u0103rii ini\u021biativelor antreprenoriale, investi\u021biilor \u0219i companiilor care contribuie la dezvoltarea mediului de afaceri din Rom\u00e2nia.\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"PPC Renewables adaug\u0103 parcului eolian Corugea un sistem BESS de 40 MW\/ 80 MWh, investi\u021bie de 87 mil. lei - industrynews.ro\" \/>\n\t\t<meta property=\"og:description\" content=\"PPC Renewables Rom\u00e2nia, cel mai mare investitor privat \u00een energie regenerabil\u0103 din Rom\u00e2nia, continu\u0103 dezvoltarea portofoliului s\u0103u de capacit\u0103\u021bi hibride \u0219i va construi \u00een cadrul parcului eolian Corugea\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/industrynews.ro\/en\/ppc-renewables-adauga-parcului-eolian-corugea-un-sistem-bess-de-40-mw-80-mwh-investitie-de-87-mil-lei\/\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/industrynews.ro\/wp-content\/uploads\/2026\/07\/ppc.jpg\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/industrynews.ro\/wp-content\/uploads\/2026\/07\/ppc.jpg\" \/>\n\t\t<meta property=\"og:image:width\" content=\"1980\" \/>\n\t\t<meta property=\"og:image:height\" content=\"1080\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2026-07-15T12:59:41+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-07-15T12:59:41+00:00\" \/>\n\t\t<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/industrynews.ro\/\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:title\" content=\"PPC Renewables adaug\u0103 parcului eolian Corugea un sistem BESS de 40 MW\/ 80 MWh, investi\u021bie de 87 mil. lei - industrynews.ro\" \/>\n\t\t<meta name=\"twitter:description\" content=\"PPC Renewables Rom\u00e2nia, cel mai mare investitor privat \u00een energie regenerabil\u0103 din Rom\u00e2nia, continu\u0103 dezvoltarea portofoliului s\u0103u de capacit\u0103\u021bi hibride \u0219i va construi \u00een cadrul parcului eolian Corugea\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/industrynews.ro\/wp-content\/uploads\/2026\/07\/ppc.jpg\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/industrynews.ro\\\/en\\\/ppc-renewables-adauga-parcului-eolian-corugea-un-sistem-bess-de-40-mw-80-mwh-investitie-de-87-mil-lei\\\/#blogposting\",\"name\":\"PPC Renewables adaug\\u0103 parcului eolian Corugea un sistem BESS de 40 MW\\\/ 80 MWh, investi\\u021bie de 87 mil. lei - industrynews.ro\",\"headline\":\"PPC Renewables adaug\\u0103 parcului eolian Corugea un sistem BESS de 40 MW\\\/ 80 MWh, investi\\u021bie de 87 mil. lei\",\"author\":{\"@id\":\"https:\\\/\\\/industrynews.ro\\\/en\\\/author\\\/suzana-ion\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/industrynews.ro\\\/en\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/industrynews.ro\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/ppc.jpg\",\"width\":1980,\"height\":1080},\"datePublished\":\"2026-07-15T14:59:41+02:00\",\"dateModified\":\"2026-07-15T14:59:41+02:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/industrynews.ro\\\/en\\\/ppc-renewables-adauga-parcului-eolian-corugea-un-sistem-bess-de-40-mw-80-mwh-investitie-de-87-mil-lei\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/industrynews.ro\\\/en\\\/ppc-renewables-adauga-parcului-eolian-corugea-un-sistem-bess-de-40-mw-80-mwh-investitie-de-87-mil-lei\\\/#webpage\"},\"articleSection\":\"Energie\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/industrynews.ro\\\/en\\\/ppc-renewables-adauga-parcului-eolian-corugea-un-sistem-bess-de-40-mw-80-mwh-investitie-de-87-mil-lei\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/industrynews.ro\\\/en\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/industrynews.ro\\\/en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/industrynews.ro\\\/en\\\/category\\\/energie\\\/#listItem\",\"name\":\"Energie\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/industrynews.ro\\\/en\\\/category\\\/energie\\\/#listItem\",\"position\":2,\"name\":\"Energie\",\"item\":\"https:\\\/\\\/industrynews.ro\\\/en\\\/category\\\/energie\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/industrynews.ro\\\/en\\\/ppc-renewables-adauga-parcului-eolian-corugea-un-sistem-bess-de-40-mw-80-mwh-investitie-de-87-mil-lei\\\/#listItem\",\"name\":\"PPC Renewables adaug\\u0103 parcului eolian Corugea un sistem BESS de 40 MW\\\/ 80 MWh, investi\\u021bie de 87 mil. lei\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/industrynews.ro\\\/en\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/industrynews.ro\\\/en\\\/ppc-renewables-adauga-parcului-eolian-corugea-un-sistem-bess-de-40-mw-80-mwh-investitie-de-87-mil-lei\\\/#listItem\",\"position\":3,\"name\":\"PPC Renewables adaug\\u0103 parcului eolian Corugea un sistem BESS de 40 MW\\\/ 80 MWh, investi\\u021bie de 87 mil. lei\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/industrynews.ro\\\/en\\\/category\\\/energie\\\/#listItem\",\"name\":\"Energie\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/industrynews.ro\\\/en\\\/#organization\",\"name\":\"industrynews.ro\",\"description\":\"Industry News este o platform\\u0103 de \\u0219tiri dedicat\\u0103 promov\\u0103rii ini\\u021biativelor antreprenoriale, investi\\u021biilor \\u0219i companiilor care contribuie la dezvoltarea mediului de afaceri din Rom\\u00e2nia.\",\"url\":\"https:\\\/\\\/industrynews.ro\\\/en\\\/\",\"email\":\"marketing@industrynews.ro\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/industrynews.ro\\\/wp-content\\\/uploads\\\/2026\\\/01\\\/industrynews-logo_color.png\",\"@id\":\"https:\\\/\\\/industrynews.ro\\\/en\\\/ppc-renewables-adauga-parcului-eolian-corugea-un-sistem-bess-de-40-mw-80-mwh-investitie-de-87-mil-lei\\\/#organizationLogo\",\"width\":866,\"height\":452,\"caption\":\"industrynews - logo_white\"},\"image\":{\"@id\":\"https:\\\/\\\/industrynews.ro\\\/en\\\/ppc-renewables-adauga-parcului-eolian-corugea-un-sistem-bess-de-40-mw-80-mwh-investitie-de-87-mil-lei\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/industrynews.ro\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/111410970\\\/admin\\\/dashboard\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/industrynews.ro\\\/en\\\/author\\\/suzana-ion\\\/#author\",\"url\":\"https:\\\/\\\/industrynews.ro\\\/en\\\/author\\\/suzana-ion\\\/\",\"name\":\"Andreea Ionescu\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/industrynews.ro\\\/en\\\/ppc-renewables-adauga-parcului-eolian-corugea-un-sistem-bess-de-40-mw-80-mwh-investitie-de-87-mil-lei\\\/#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/75cdeee1bea5b1ba554df75cf6e793faaddcfd8e4f27f1eec92ffcff3db258b5?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Andreea Ionescu\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/industrynews.ro\\\/en\\\/ppc-renewables-adauga-parcului-eolian-corugea-un-sistem-bess-de-40-mw-80-mwh-investitie-de-87-mil-lei\\\/#webpage\",\"url\":\"https:\\\/\\\/industrynews.ro\\\/en\\\/ppc-renewables-adauga-parcului-eolian-corugea-un-sistem-bess-de-40-mw-80-mwh-investitie-de-87-mil-lei\\\/\",\"name\":\"PPC Renewables adaug\\u0103 parcului eolian Corugea un sistem BESS de 40 MW\\\/ 80 MWh, investi\\u021bie de 87 mil. lei - industrynews.ro\",\"description\":\"PPC Renewables Rom\\u00e2nia, cel mai mare investitor privat \\u00een energie regenerabil\\u0103 din Rom\\u00e2nia, continu\\u0103 dezvoltarea portofoliului s\\u0103u de capacit\\u0103\\u021bi hibride \\u0219i va construi \\u00een cadrul parcului eolian Corugea\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/industrynews.ro\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/industrynews.ro\\\/en\\\/ppc-renewables-adauga-parcului-eolian-corugea-un-sistem-bess-de-40-mw-80-mwh-investitie-de-87-mil-lei\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/industrynews.ro\\\/en\\\/author\\\/suzana-ion\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/industrynews.ro\\\/en\\\/author\\\/suzana-ion\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/industrynews.ro\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/ppc.jpg\",\"@id\":\"https:\\\/\\\/industrynews.ro\\\/en\\\/ppc-renewables-adauga-parcului-eolian-corugea-un-sistem-bess-de-40-mw-80-mwh-investitie-de-87-mil-lei\\\/#mainImage\",\"width\":1980,\"height\":1080},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/industrynews.ro\\\/en\\\/ppc-renewables-adauga-parcului-eolian-corugea-un-sistem-bess-de-40-mw-80-mwh-investitie-de-87-mil-lei\\\/#mainImage\"},\"datePublished\":\"2026-07-15T14:59:41+02:00\",\"dateModified\":\"2026-07-15T14:59:41+02:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/industrynews.ro\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/industrynews.ro\\\/en\\\/\",\"name\":\"industrynews.ro\",\"alternateName\":\"industrynews.ro\",\"description\":\"Industry News este o platform\\u0103 de \\u0219tiri dedicat\\u0103 promov\\u0103rii ini\\u021biativelor antreprenoriale, investi\\u021biilor \\u0219i companiilor care contribuie la dezvoltarea mediului de afaceri din Rom\\u00e2nia.\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/industrynews.ro\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>PPC Renewables adaug\u0103 parcului eolian Corugea un sistem BESS de 40 MW\/ 80 MWh, investi\u021bie de 87 mil. lei - industrynews.ro<\/title>\n\n","aioseo_head_json":{"title":"PPC Renewables adaug\u0103 parcului eolian Corugea un sistem BESS de 40 MW\/ 80 MWh, investi\u021bie de 87 mil. lei - industrynews.ro","description":"PPC Renewables Rom\u00e2nia, cel mai mare investitor privat \u00een energie regenerabil\u0103 din Rom\u00e2nia, continu\u0103 dezvoltarea portofoliului s\u0103u de capacit\u0103\u021bi hibride \u0219i va construi \u00een cadrul parcului eolian Corugea","canonical_url":"https:\/\/industrynews.ro\/en\/ppc-renewables-adauga-parcului-eolian-corugea-un-sistem-bess-de-40-mw-80-mwh-investitie-de-87-mil-lei\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/industrynews.ro\/en\/ppc-renewables-adauga-parcului-eolian-corugea-un-sistem-bess-de-40-mw-80-mwh-investitie-de-87-mil-lei\/#blogposting","name":"PPC Renewables adaug\u0103 parcului eolian Corugea un sistem BESS de 40 MW\/ 80 MWh, investi\u021bie de 87 mil. lei - industrynews.ro","headline":"PPC Renewables adaug\u0103 parcului eolian Corugea un sistem BESS de 40 MW\/ 80 MWh, investi\u021bie de 87 mil. lei","author":{"@id":"https:\/\/industrynews.ro\/en\/author\/suzana-ion\/#author"},"publisher":{"@id":"https:\/\/industrynews.ro\/en\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/industrynews.ro\/wp-content\/uploads\/2026\/07\/ppc.jpg","width":1980,"height":1080},"datePublished":"2026-07-15T14:59:41+02:00","dateModified":"2026-07-15T14:59:41+02:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/industrynews.ro\/en\/ppc-renewables-adauga-parcului-eolian-corugea-un-sistem-bess-de-40-mw-80-mwh-investitie-de-87-mil-lei\/#webpage"},"isPartOf":{"@id":"https:\/\/industrynews.ro\/en\/ppc-renewables-adauga-parcului-eolian-corugea-un-sistem-bess-de-40-mw-80-mwh-investitie-de-87-mil-lei\/#webpage"},"articleSection":"Energie"},{"@type":"BreadcrumbList","@id":"https:\/\/industrynews.ro\/en\/ppc-renewables-adauga-parcului-eolian-corugea-un-sistem-bess-de-40-mw-80-mwh-investitie-de-87-mil-lei\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/industrynews.ro\/en\/#listItem","position":1,"name":"Home","item":"https:\/\/industrynews.ro\/en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/industrynews.ro\/en\/category\/energie\/#listItem","name":"Energie"}},{"@type":"ListItem","@id":"https:\/\/industrynews.ro\/en\/category\/energie\/#listItem","position":2,"name":"Energie","item":"https:\/\/industrynews.ro\/en\/category\/energie\/","nextItem":{"@type":"ListItem","@id":"https:\/\/industrynews.ro\/en\/ppc-renewables-adauga-parcului-eolian-corugea-un-sistem-bess-de-40-mw-80-mwh-investitie-de-87-mil-lei\/#listItem","name":"PPC Renewables adaug\u0103 parcului eolian Corugea un sistem BESS de 40 MW\/ 80 MWh, investi\u021bie de 87 mil. lei"},"previousItem":{"@type":"ListItem","@id":"https:\/\/industrynews.ro\/en\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/industrynews.ro\/en\/ppc-renewables-adauga-parcului-eolian-corugea-un-sistem-bess-de-40-mw-80-mwh-investitie-de-87-mil-lei\/#listItem","position":3,"name":"PPC Renewables adaug\u0103 parcului eolian Corugea un sistem BESS de 40 MW\/ 80 MWh, investi\u021bie de 87 mil. lei","previousItem":{"@type":"ListItem","@id":"https:\/\/industrynews.ro\/en\/category\/energie\/#listItem","name":"Energie"}}]},{"@type":"Organization","@id":"https:\/\/industrynews.ro\/en\/#organization","name":"industrynews.ro","description":"Industry News este o platform\u0103 de \u0219tiri dedicat\u0103 promov\u0103rii ini\u021biativelor antreprenoriale, investi\u021biilor \u0219i companiilor care contribuie la dezvoltarea mediului de afaceri din Rom\u00e2nia.","url":"https:\/\/industrynews.ro\/en\/","email":"marketing@industrynews.ro","logo":{"@type":"ImageObject","url":"https:\/\/industrynews.ro\/wp-content\/uploads\/2026\/01\/industrynews-logo_color.png","@id":"https:\/\/industrynews.ro\/en\/ppc-renewables-adauga-parcului-eolian-corugea-un-sistem-bess-de-40-mw-80-mwh-investitie-de-87-mil-lei\/#organizationLogo","width":866,"height":452,"caption":"industrynews - logo_white"},"image":{"@id":"https:\/\/industrynews.ro\/en\/ppc-renewables-adauga-parcului-eolian-corugea-un-sistem-bess-de-40-mw-80-mwh-investitie-de-87-mil-lei\/#organizationLogo"},"sameAs":["https:\/\/www.facebook.com\/industrynews.ro\/","https:\/\/www.linkedin.com\/company\/111410970\/admin\/dashboard\/"]},{"@type":"Person","@id":"https:\/\/industrynews.ro\/en\/author\/suzana-ion\/#author","url":"https:\/\/industrynews.ro\/en\/author\/suzana-ion\/","name":"Andreea Ionescu","image":{"@type":"ImageObject","@id":"https:\/\/industrynews.ro\/en\/ppc-renewables-adauga-parcului-eolian-corugea-un-sistem-bess-de-40-mw-80-mwh-investitie-de-87-mil-lei\/#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/75cdeee1bea5b1ba554df75cf6e793faaddcfd8e4f27f1eec92ffcff3db258b5?s=96&d=mm&r=g","width":96,"height":96,"caption":"Andreea Ionescu"}},{"@type":"WebPage","@id":"https:\/\/industrynews.ro\/en\/ppc-renewables-adauga-parcului-eolian-corugea-un-sistem-bess-de-40-mw-80-mwh-investitie-de-87-mil-lei\/#webpage","url":"https:\/\/industrynews.ro\/en\/ppc-renewables-adauga-parcului-eolian-corugea-un-sistem-bess-de-40-mw-80-mwh-investitie-de-87-mil-lei\/","name":"PPC Renewables adaug\u0103 parcului eolian Corugea un sistem BESS de 40 MW\/ 80 MWh, investi\u021bie de 87 mil. lei - industrynews.ro","description":"PPC Renewables Rom\u00e2nia, cel mai mare investitor privat \u00een energie regenerabil\u0103 din Rom\u00e2nia, continu\u0103 dezvoltarea portofoliului s\u0103u de capacit\u0103\u021bi hibride \u0219i va construi \u00een cadrul parcului eolian Corugea","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/industrynews.ro\/en\/#website"},"breadcrumb":{"@id":"https:\/\/industrynews.ro\/en\/ppc-renewables-adauga-parcului-eolian-corugea-un-sistem-bess-de-40-mw-80-mwh-investitie-de-87-mil-lei\/#breadcrumblist"},"author":{"@id":"https:\/\/industrynews.ro\/en\/author\/suzana-ion\/#author"},"creator":{"@id":"https:\/\/industrynews.ro\/en\/author\/suzana-ion\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/industrynews.ro\/wp-content\/uploads\/2026\/07\/ppc.jpg","@id":"https:\/\/industrynews.ro\/en\/ppc-renewables-adauga-parcului-eolian-corugea-un-sistem-bess-de-40-mw-80-mwh-investitie-de-87-mil-lei\/#mainImage","width":1980,"height":1080},"primaryImageOfPage":{"@id":"https:\/\/industrynews.ro\/en\/ppc-renewables-adauga-parcului-eolian-corugea-un-sistem-bess-de-40-mw-80-mwh-investitie-de-87-mil-lei\/#mainImage"},"datePublished":"2026-07-15T14:59:41+02:00","dateModified":"2026-07-15T14:59:41+02:00"},{"@type":"WebSite","@id":"https:\/\/industrynews.ro\/en\/#website","url":"https:\/\/industrynews.ro\/en\/","name":"industrynews.ro","alternateName":"industrynews.ro","description":"Industry News este o platform\u0103 de \u0219tiri dedicat\u0103 promov\u0103rii ini\u021biativelor antreprenoriale, investi\u021biilor \u0219i companiilor care contribuie la dezvoltarea mediului de afaceri din Rom\u00e2nia.","inLanguage":"en-US","publisher":{"@id":"https:\/\/industrynews.ro\/en\/#organization"}}]},"og:locale":"en_US","og:site_name":"industrynews.ro - Industry News este o platform\u0103 de \u0219tiri dedicat\u0103 promov\u0103rii ini\u021biativelor antreprenoriale, investi\u021biilor \u0219i companiilor care contribuie la dezvoltarea mediului de afaceri din Rom\u00e2nia.","og:type":"article","og:title":"PPC Renewables adaug\u0103 parcului eolian Corugea un sistem BESS de 40 MW\/ 80 MWh, investi\u021bie de 87 mil. lei - industrynews.ro","og:description":"PPC Renewables Rom\u00e2nia, cel mai mare investitor privat \u00een energie regenerabil\u0103 din Rom\u00e2nia, continu\u0103 dezvoltarea portofoliului s\u0103u de capacit\u0103\u021bi hibride \u0219i va construi \u00een cadrul parcului eolian Corugea","og:url":"https:\/\/industrynews.ro\/en\/ppc-renewables-adauga-parcului-eolian-corugea-un-sistem-bess-de-40-mw-80-mwh-investitie-de-87-mil-lei\/","og:image":"https:\/\/industrynews.ro\/wp-content\/uploads\/2026\/07\/ppc.jpg","og:image:secure_url":"https:\/\/industrynews.ro\/wp-content\/uploads\/2026\/07\/ppc.jpg","og:image:width":1980,"og:image:height":1080,"article:published_time":"2026-07-15T12:59:41+00:00","article:modified_time":"2026-07-15T12:59:41+00:00","article:publisher":"https:\/\/www.facebook.com\/industrynews.ro\/","twitter:card":"summary_large_image","twitter:title":"PPC Renewables adaug\u0103 parcului eolian Corugea un sistem BESS de 40 MW\/ 80 MWh, investi\u021bie de 87 mil. lei - industrynews.ro","twitter:description":"PPC Renewables Rom\u00e2nia, cel mai mare investitor privat \u00een energie regenerabil\u0103 din Rom\u00e2nia, continu\u0103 dezvoltarea portofoliului s\u0103u de capacit\u0103\u021bi hibride \u0219i va construi \u00een cadrul parcului eolian Corugea","twitter:image":"https:\/\/industrynews.ro\/wp-content\/uploads\/2026\/07\/ppc.jpg"},"aioseo_meta_data":{"post_id":"7732","title":null,"description":"PPC Renewables Rom\u00e2nia, cel mai mare investitor privat \u00een energie regenerabil\u0103 din Rom\u00e2nia, continu\u0103 dezvoltarea portofoliului s\u0103u de capacit\u0103\u021bi hibride \u0219i va construi \u00een cadrul parcului eolian Corugea","keywords":null,"keyphrases":{"focus":{"keyphrase":"","score":0,"analysis":{"keyphraseInTitle":{"score":0,"maxScore":9,"error":1}}},"additional":[]},"primary_term":null,"canonical_url":null,"og_title":"#post_title #separator_sa #site_title","og_description":"PPC Renewables Rom\u00e2nia, cel mai mare investitor privat \u00een energie regenerabil\u0103 din Rom\u00e2nia, continu\u0103 dezvoltarea portofoliului s\u0103u de capacit\u0103\u021bi hibride \u0219i va construi \u00een cadrul parcului eolian Corugea","og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":"","og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"BlogPosting","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":"-1","robots_max_videopreview":"-1","robots_max_imagepreview":"large","priority":null,"frequency":"default","local_seo":null,"seo_analyzer_scan_date":"2026-07-15 12:59:55","breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"ai":{"faqs":[],"keyPoints":[],"schemas":[],"titles":[],"descriptions":[],"socialPosts":{"email":{"subject":"","preview":"","content":""},"linkedin":[],"twitter":[],"facebook":[],"instagram":[]}},"created":"2026-07-15 12:58:18","updated":"2026-07-15 18:07:11","focus_keyword":null,"additional_keywords":null,"truseo_locale":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/industrynews.ro\/en\/\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/industrynews.ro\/en\/category\/energie\/\" title=\"Energie\">Energie<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\tPPC Renewables adaug\u0103 parcului eolian Corugea un sistem BESS de 40 MW\/ 80 MWh, investi\u021bie de 87 mil. lei\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/industrynews.ro\/en\/"},{"label":"Energie","link":"https:\/\/industrynews.ro\/en\/category\/energie\/"},{"label":"PPC Renewables adaug\u0103 parcului eolian Corugea un sistem BESS de 40 MW\/ 80 MWh, investi\u021bie de 87 mil. lei","link":"https:\/\/industrynews.ro\/en\/ppc-renewables-adauga-parcului-eolian-corugea-un-sistem-bess-de-40-mw-80-mwh-investitie-de-87-mil-lei\/"}],"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/industrynews.ro\/en\/wp-json\/wp\/v2\/posts\/7732","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/industrynews.ro\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/industrynews.ro\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/industrynews.ro\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/industrynews.ro\/en\/wp-json\/wp\/v2\/comments?post=7732"}],"version-history":[{"count":1,"href":"https:\/\/industrynews.ro\/en\/wp-json\/wp\/v2\/posts\/7732\/revisions"}],"predecessor-version":[{"id":7735,"href":"https:\/\/industrynews.ro\/en\/wp-json\/wp\/v2\/posts\/7732\/revisions\/7735"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/industrynews.ro\/en\/wp-json\/wp\/v2\/media\/7734"}],"wp:attachment":[{"href":"https:\/\/industrynews.ro\/en\/wp-json\/wp\/v2\/media?parent=7732"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/industrynews.ro\/en\/wp-json\/wp\/v2\/categories?post=7732"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/industrynews.ro\/en\/wp-json\/wp\/v2\/tags?post=7732"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}