Close Menu

    Subscribe for news

    Recent news

    Atacul cibernetic de la Cadastru blochează piața imobiliară rezidențială

    July 21, 2026

    ACEA: Vânzările de mașini electrice au înregistrat un salt de 43% în luna mai

    June 23, 2026

    Cum și-a transformat Lumen Technologies întreaga forță de muncă în dezvoltatori de agenți IA

    June 22, 2026
    Facebook LinkedIn
    Facebook LinkedIn
    industrynews.roindustrynews.ro
    Send press release
    • Energy
    • Financial
    • Companies
    • Construction
    • Transportation
    • AI for business
    industrynews.roindustrynews.ro
    Home»Transportation»Alstom will modernize Lot 1 of the Craiova-Caransebeș section, part of an important European railway corridor
    Transportation

    Alstom will modernize Lot 1 of the Craiova-Caransebeș section, part of an important European railway corridor

    The project will include the implementation of the ERTMS Level 2 signaling system and the modernization of electrification, ensuring greater capacity, improved energy efficiency, and increased service reliability, transforming regional rail transport.
    By Andreea IonescuApril 2, 2026No Comments4 Mins Read
    Facebook Twitter Pinterest LinkedIn Tumblr Email
    Share
    Facebook Twitter LinkedIn Pinterest Email

    Alstom, a global leader in smart and sustainable mobility, has signed the contract to modernize the Craiova–Filiași section of the Craiova–Caransebeș railway line in Romania. The project will include the implementation of the ERTMS Level 2 signaling system and the modernization of electrification, ensuring greater capacity, improved energy efficiency, and increased service reliability, transforming rail transport in the region.

    The contract was signed by the TrackWorks Association, formed by Alstom and the civil works company Terna Tourist Technical and Maritime Société Anonyme, with CFR SA, the company that manages Romania's railway infrastructure. Alstom will supply the signaling, traffic management, and electrification systems, while Terna will be responsible for civil works. The contract has an implementation period of 117 months and includes both the design and execution phases.

    The contract aims to modernize 38 kilometers of railway line between Craiova and Filiași. The project will enable the improvement of electrification facilities, modernization of the infrastructure and superstructure, signaling and telecommunication systems, as well as civil works such as station modernization, bridge and walkway replacement, drainage system repair, and embankment consolidation. Alstom will directly coordinate the implementation of ERTMS Level 2 and GSM-R systems, the introduction of electronic interlocking and passenger information systems, as well as electrification works, including the modernization of power supply sources and contact lines.

    These extensive modernizations will allow passenger trains to operate at speeds of up to 160 km/h, and freight trains at up to 120 km/h, reducing travel times and increasing network capacity to meet the growing transport demand in the region. The introduction of new electrification and power supply systems will significantly improve energy efficiency and reduce the railway's environmental footprint, supporting Romania's transition towards greener and more sustainable transport solutions.

    „By aligning with European corridor standards and promoting sustainable mobility, this project demonstrates Romania's commitment to modern and environmentally responsible rail infrastructure. This contract strengthens Alstom's leading position in the Romanian railway market, both in signaling and electrification, a position built over 30 years of market presence. Bucharest has become a strategic hub for Alstom's signaling competencies, hosting a team of over 400 highly qualified engineers whose expertise supports both local and international projects,” said Șerban Iorga, Alstom General Manager for Romania, Bulgaria, and the Republic of Moldova.

    The Craiova – Drobeta Turnu Severin – Caransebeș section, with a length of 225 km, is part of the important Orient/East Med corridor, a major European railway artery that crosses eight countries and stretches for 6,500 km.

    Alstom is a global leader in ERTMS implementation and is recognized as a pioneer in the development of new features and standards. Alstom's digital solutions offer optimal efficiency and high levels of safety and security. In Europe, Alstom supplies over 30% of operational ERTMS Level 2 lines, demonstrating a significant presence and a major contribution to the development of this technology on the continent.

    Alstom has been active in Romania for more than 30 years and is a market leader in rail electrification and signaling solutions, as well as a supplier of rolling stock for metro and mainline railways. The company is responsible for the implementation of signaling or electrification solutions on the northern branch of the Rhine-Danube railway corridor in Romania, on two lots of the Cluj-Oradea line, as well as on Lot 1 of the Lugoj-Caransebeș section. Alstom is also modernizing Romania's oldest railway line, Bucharest-Giurgiu, inaugurated in 1869. The company is part of the consortium building Romania's second metro system in Cluj Napoca, the country's first fully automated metro line. The first CBTC solution for urban signaling in Romania is being implemented by Alstom on Line 5 of the Bucharest metro. At the same time, the company is a long-term supplier of maintenance services for the Bucharest metro fleet, with the current contract valid until 2036.

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

    Related Posts

    PPC blue și Cometex extind infrastructura de încărcare pentru vehicule electrice

    October 23, 2026

    CarVertical: Peste jumătate dintre mașinile rulate verificate în România aveau daune

    October 20, 2026

    Transportatorii solicită amânarea cu șase luni a aplicării TollRo

    September 25, 2026
    PPA
    Most read articles

    OMV Petrom: Proiectul eolian de la Gura Văii (CEE Onești) obține o finanțare de 47 de mil. euro

    July 27, 2026

    PPC Renewables adaugă parcului eolian Fântânele-Vest un sistem BESS de 45 MW/ 91 MWh

    July 23, 2026

    PPC: Șapte stații de încărcare ultra-rapide pentru vehicule electrice, puse în funcțiune la Aeroportul Otopeni

    July 21, 2026

    Gradațiile corespunzătoare tranșelor de vechime în muncă majorează între 2,5% și 7,5% salariul de bază

    July 21, 2026
    Don't Miss

    BIMsprint: Digitalizarea construcțiilor devine o condiție de piață

    Construction October 23, 2026

    Digitalizarea sectorului construcțiilor va deveni, în următorii ani, o condiție tot mai importantă pentru accesul…

    O veche breșă de securitate arată cât de mult s-a scurtat timpul de reacție al companiilor în era AI

    October 23, 2026

    Guvernanța fiscală înainte de exit: Cât contează în prețul tranzacției?

    October 23, 2026

    Iarna insolvențelor: Valul de falimente va continua să crească – analiză

    October 23, 2026

    Subscribe for news

    Subscribe for news

    PPA
    industrynews.ro
    Facebook LinkedIn
    • Energy
    • Companies
    • Construction
    • Financial
    • Transportation
    • AI for business
    • About us
    • TERMS AND CONDITIONS
    • Privacy Policy
    • COOKIES POLICY
    • EDITORIAL DISCLAIMER
    • Contact
    © 2026 industry news. All rights reserved

    Type above and press Enter to search. Press Esc to cancel.

    English
    Romanian